- 5,689.00 € Price
The SunEnergyXT 500 with 5× B500 expansion batteries is an all-in-one hybrid storage system from DRBO Greenenergy for households that want to store solar power and have emergency power when the grid goes down. The set includes a main storage unit with a built-in inverter and five B500 expansion batteries, giving a combined storage capacity of 30 kWh and grid feed-in of 800 W. The main storage unit offers an emergency power output of up to 2,400 W and a UPS mode with a switchover time of 10 ms at most.
As of 27 Nov 2026 · Affiliate link
About this offer
The SunEnergyXT 500 with 5× B500 expansion batteries is an all-in-one hybrid storage system from DRBO Greenenergy for households that want to store solar power and have emergency power when the grid goes down. The set includes a main storage unit with a built-in inverter and five B500 expansion batteries, giving a combined storage capacity of 30 kWh and grid feed-in of 800 W. The main storage unit offers an emergency power output of up to 2,400 W and a UPS mode with a switchover time of 10 ms at most.
Terms
Rates & Costs
- One-off cost
- 5,689.00 €
Amount & Term
- Type
- Product
Highlights
- Built-in inverter, storage and energy management in one device, with 4× 625 W MPPT inputs
- UPS mode with a switchover time of 10 ms at most, according to the technical data sheet
- EVE premium LiFePO4 cells with at least 10,000 cycles, according to the test conditions in the PDF
- IP65 protection rating and passive, fanless cooling for outdoor use
- Built-in aerosol fire extinguishing system in the batteries
- Capacity can be expanded in 5 kWh steps up to 30 kWh per tower using B500 expansion batteries
Conditions & Documents
Conditions
Price according to the product details from DRBO Greenenergy (DE); the shop is the binding source. Additional conditions: "The power you can actually use depends on installation, device settings, grid connection and local rules. A smart meter is only included if it is listed in the set. Compatibility with smart meters and expansion stages must be technically planned and approved."
Required documents
- A 3 m AC grid connection cable is included with each main storage unit in the set
- Installation by a qualified installer, assembly, electrical installation and official registration are not included
The offer on the provider's site